
Uses of 1U–12U CubeSats, the development process and cost items for a 6U mission.
CubeSats are small satellites standardised on a 10×10×10 cm unit (1U). Weighing a few kilograms, they can perform Earth observation, communications and scientific measurements at a tenth of the cost of traditional satellites.
Size and mission
1U–3U satellites are used for education and technology demonstration, and 6U–12U satellites for Earth observation, IoT communication and scientific missions. A 6U satellite weighs 9–12 kg and can generate about 40 W and carry a camera with 3–5 m resolution.
Development stages
- Mission definition (2–3 months): Payload, orbit and data requirements.
- Design and prototype (4–6 months): Power, communication, attitude control and flight computer.
- Integration and test (4–5 months): Clean-room assembly, vibration and thermal vacuum testing.
- Launch and early operations (2 months): Integration with the launcher, commissioning after orbit insertion.
In total a 6U satellite needs 14–18 months.
Cost items (2026, 6U Earth-observation satellite)
- Satellite development and production: ₺18–28 million
- Payload (camera): ₺6–10 million
- Launch (rideshare): ₺9–14 million
- Ground segment and one year of operations: ₺5–10 million
The total is about ₺38–62 million. In serial production unit cost can fall by up to 30%.
Examples of use
Agricultural productivity monitoring, forest fire detection, ship tracking (AIS), rural IoT and university experiments are the most common applications. The GU-1 satellites provided maps of the affected areas within 36 hours in the 2025 flood disaster.
Points to watch
Frequency allocation and international registration (ITU), launch permit, a space-debris mitigation plan and an end-of-life strategy are legal issues to plan at the project start. Ground-station access and data-processing infrastructure are the key to operational success.
Service model
The customer can bring only the payload and take platform, launch and operations from Gökbilge in a 'satellite as a service' model.
Team and infrastructure
A 6U CubeSat project typically involves a team of 12–18: a systems engineer, electronics designers, software developers, a mechanical designer, a test engineer and a project manager. At Gökbilge 70% of platform components are made in-house, so this team is less affected by supply delays.
When CubeSat, when large satellite?
CubeSats suit rapid development, low cost and renewable mission constellations. Missions requiring high-resolution imaging, long-life geostationary communication or high power need larger platforms. Most operators use both classes together.
Related Posts
Space Debris and Responsible Orbit Operations
The debris problem in low orbit, the five-year rule and measures small satellite operators should take.
Read More